New River Eade Road leakage refurbishment project completes
27th August 2025Barhale, alongside Thames Water have recently completed a £6.3m project to refurbish a section of the New River alongside Eade Road, in order to future-proof water supplies to North London and prevent leakage.
The New River, Thames Water’s oldest asset, delivers high-quality drinking water for customers across North London. The works carried out have stabilised the embankment to prevent future flooding risk and leakage, through the installation of a sheet piled wall using a Giken Piling Rig.
Find out more from Steve Collett (Contracts Manager) and Dan Bolton (Sub Agent) in this video.