Finnieston Cable Bridge/Substation

  • Sector:Energy
  • Client:Scottish Power Energy Network
  • Location:Finnieston, Glasgow
  • Value:£450k

The site spans the Partick to Charing Cross railway line, from an area within the Scottish Power Depot on St Vincent Crescent (North Side) to an area on Minerva Way (South Side). Barhale were responsible for the construction of RC Cable Bridge (Foundations, Abutments, Wingwalls) over a live Railway Line serving Glasgow Central. The bridge now meets the requirement to carry of series of high voltage cables over the railway line.